# Prospecting in energy: signals, sources and who decides

> ALTARA (altaratech.com) is an AI sales agent for B2B teams. The team texts it in WhatsApp, iMessage, SMS, Slack or Microsoft Teams; it finds accounts with a dated reason to buy and the person who decides, writes in the team’s voice, runs email and LinkedIn cadences only for contacts a person approved, and keeps the CRM current.

Updated 2026-11-20 · https://www.altaratech.com/industries/energy

Energy buyers are easiest to reach when a project gets a date. In Brazil, ANEEL's transmission auctions name the winner of each lot along with a deadline to build; in the US, EIA's monthly generator inventory tracks proposed units; utilities and development banks tender the rest. Reach the winner's engineering and procurement leads in the months after the award, while its supply chain is still being set.

## Signals that work in energy

**An auction winner with a clock.** ANEEL's transmission auction 4/2026, held on October 30, 2026, awarded all 8 lots: R$8.8 billion of transmission investment, 1,866 km of new lines and substations with 12,694 MVA of transformation capacity in Bahia, Goiás, Mato Grosso do Sul, Paraíba, Paraná, Rondônia and São Paulo. The concessions run 30 years, and each lot has 42 to 60 months to reach commercial operation. Every winner now needs engineering, surveys, environmental studies, equipment and construction.

**A proposed plant shows up.** Form EIA-860M tracks the status of existing and proposed generating units at US plants with 1 MW or more of combined capacity, every month. The release of October 23, 2026 carried September data, and the next was scheduled for November 24, 2026. Comparing two monthly files shows which proposed units were added or dropped.

**A utility or ministry tenders work.** Power projects financed by development banks publish invitations for bids with deadlines. One in Ethiopia, posted on October 12, 2026, sought plant design, supply, installation and commissioning of transmission lines.

**A developer raises money or hires.** A developer that closes financing or posts project engineering and procurement roles is moving from development to construction, which is when suppliers get chosen.

## Where the data comes from

- **ANEEL** publishes a news release per lot on auction day, with the winner, the works, the estimated investment and the deadline, plus a results file with the winning bids.
- **EIA-860M**, monthly, for US generating units, with a tab of units retired since 2002.
- **World Bank procurement notices** for the power projects it finances.
- **TED** for EU utilities and grid operators.
- **SAM.gov** for US federal energy buyers.

```facts
R$8.8 billion | Transmission investment awarded in ANEEL auction 4/2026
1,866 km | New transmission lines across its 8 lots
42 to 60 months | Each lot's deadline to reach commercial operation
```

## Who decides

At a transmission or generation developer, the VP of development leads until financial close; after that, the engineering director and the head of procurement choose suppliers. At an EPC contractor, the project director and the procurement manager. At a utility, asset management and engineering write the specification, and procurement runs the tender. Winners of a lot usually contract studies and engineering first and long-lead equipment next.

## How to approach them

Name the lot, the substation or the unit, and the deadline. Offer what fits the stage: studies and surveys right after an auction, long-lead equipment once the design is set, operations services near energization. In Brazil, write in Portuguese, and expect the first conversation with engineering rather than purchasing.

```flow
title: From an auction lot to a first approach
Auction result | ANEEL names the winner, the works and the deadline
The winner | Contracts studies and engineering first
Who decides | The engineering director and the head of procurement
First approach | Name the lot and the deadline, in Portuguese
```

ALTARA, an AI sales agent your team texts like a teammate in WhatsApp, iMessage, SMS, Slack or Microsoft Teams, reads TED, the World Bank, SAM.gov, Texas ESBD and CanadaBuys live and watches funding rounds, hiring and leadership changes. Each qualified signal arrives in the chat with who decides, a verified work email and a draft in the sender's voice. A person on your team approves every message before it is sent.

## An example

```card
company: EDP Transmissão Goiás S.A.
location: Goiás and Bahia, Brazil
what_changed: Won Lot 2 of ANEEL transmission auction 4/2026: the Iaciara 2 substation (230/138 kV, 300 MVA) and 126 km of lines linking Iaciara and Guarani de Goiás to Correntina, with an estimated investment of R$317 million
date: 2026-10-30
source_label: ANEEL news release on Lot 2
source_url: https://www.gov.br/aneel/pt-br/assuntos/noticias/2026/lote-2-do-leilao-de-transmissao-no-4-2026-e-da-edp-transmissao-goias-s.a
why_now: The works have 48 months to finish, so engineering, surveys and long-lead equipment are planned in the first months after the contract is signed
talk_to: Engineering director for the project
route: Email in Portuguese first, LinkedIn connection three days later
```

## FAQ

### Where can I see who won a Brazilian transmission auction?

ANEEL publishes a news release for each lot on auction day, naming the winner, the substations and kilometers of line, the estimated investment and the construction deadline, and a results file with the winning bids. Auction 4/2026, held on October 30, 2026, awarded all 8 lots across seven states, with 42 to 60 months to reach commercial operation.

### What is EIA-860M?

A monthly survey by the US Energy Information Administration that tracks the status of existing and proposed generating units at power plants with 1 MW or more of combined nameplate capacity, plus a list of units retired since 2002. The October 23, 2026 release carried September data, and the next release was scheduled for November 24, 2026.

### When is the best time to sell to an auction winner?

Soon after the award. Winners of ANEEL's 2026 transmission lots have 42 to 60 months to reach commercial operation, so engineering, environmental studies and long-lead equipment are decided early. A supplier that arrives after the design is frozen competes mostly on price. Name the lot and the deadline in your first message.

## Sources

- [Leilão de Transmissão nº 4/2026 termina com os 8 lotes arrematados, ANEEL](https://www.gov.br/aneel/pt-br/assuntos/noticias/2026/leilao-de-transmissao-no-4-2026-termina-com-os-8-lotes-arrematados-e-economia-para-o-consumidor), read on 2026-11-17
- [Lote 2 do Leilão de Transmissão nº 4/2026 é da EDP Transmissão Goiás S.A., ANEEL](https://www.gov.br/aneel/pt-br/assuntos/noticias/2026/lote-2-do-leilao-de-transmissao-no-4-2026-e-da-edp-transmissao-goias-s.a), read on 2026-11-17
- [Form EIA-860M, Preliminary Monthly Electric Generator Inventory, US Energy Information Administration](https://www.eia.gov/electricity/data/eia860m/), read on 2026-11-17
- [World Bank procurement notice OP00473734, transmission lines, Ethiopia](https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00473734), read on 2026-11-17
